Redcliffe Wharf Building B

THE ANTARES BUILDING

3,916 sq m (42,151 sq ft) of contemporary, sustainable office accommodation.

The Antares Building will form part of a new and vibrant mixed-used development at Redcliffe Wharf. The Grade A building will offer highly sustainable credentials in a contemporary and stylish office designed for Bristol’s thriving business community.

Interior of Building B reception, Redcliffe Wharf

THE OFFICES

With flexible space for over 400 people based upon approximate net internal floor areas, and set across 3,916 sq m (42,151 sq ft) on ground to fourth floors, the prominent and highly desirable office building will reflect the site’s stunning waterside location, whilst preserving views of the neighbouring St Mary Redcliffe Church. The building is further enhanced by roof terraces serving the second and third floors as well as fantastic floor to ceiling glazing throughout.

Download floorplans

SPECIFICATION

  • Double height reception
  • Open plan offices with exposed services
  • Roof terraces
  • Four pipe fan coil air conditioning
  • LED lighting and full access raised floors
  • 150 cycle spaces and 10 car spaces
  • 9 dedicated showers
Download full specification
Redcliffe Wharf office interior

The Antares Building at Redcliffe Wharf is designed to the British Council for Offices’ Guide 2019 Grade A standard. It will target BREEAM rating of ‘Excellent’ and an A-rated energy performance certificate (EPC) as well as being designed to enable a WELL Gold rating.

Other sustainable development initiatives include:

  • Connection to the innovative district heat network
  • Solar PV panels with battery storage on site
  • Enhancement of ecology to roof areas and Quaker Gardens
  • Smart electric vehicle charging points
  • 150 bicycle spaces
  • 8 shower rooms, one accessible shower room and a drying room
  • Wireless and addressable lighting management system including daylight dimming
  • Flexible and easily adapted high efficiency LED lighting throughout
  • Enhanced insulation standards and air tightness criteria to reduce utility consumption
  • Low water usage fittings including flushing for urinals and WCs
  • Sustainably sourced larch rainscreen cladding
  • Responsibly sourced materials referenced to the Green Guide to Material Specification
  • Smart building integration with BMS / mechanical systems to enhance sustainability, monitor occupancy, space utilisation and well being
  • Energy efficient, user friendly environmental controls and heating / cooling system
  • Best practice ventilation rates utilised

LOCAL AREA


Redcliffe wharf

Redcliffe Way, Redcliffe, Bristol BS1 6SR, UK


Cabot Circus

Bond St S Broadmead Bristol BS1 3BX

Visit website

Bristol Bus & Coach Station

Bristol, Bristol BS1 3NU, UK

Visit website

Park Street

52 Park St, Bristol BS1 5JN, UK

Visit website

Castle Park

Broad Weir Bristol BS1 3XB

Visit website

Wapping Wharf

Wapping Wharf Bristol

Visit website

Temple Meads

Temple Meads bristol

Visit website

St Nicholas Market

St Nicholas Market bristol

Visit website

Arnolfini

16 Narrow Quay, Bristol BS1 4QA, UK

Visit website

King Street

Kings Court, 11 King St, Bristol BS1 4EF, UK


Bristol Old Vic

36 King St, Bristol BS1 4DZ, UK

Visit website

Queen Square

59 Queen Square, Bristol BS1 4JZ, UK

Visit website

Download The Antares Building brochure